The Final Days and The MOJO
The MOJO was the best event of IST since my 5 years in this institution. Congratulations!
By the side of The Fortress team I am thankful for the team we have, everyone worked a lot, and well, and the communication was very easy between all members. That is why The Fortress project was able to be developed with this success. But not everything was easy, during the last week our effforts were multiplied by 100! We worked several days and some days with a only 2 or 3 hours of sleeping to garantee everything was done. This was because we wanted to implement every single detail in our game. Of course there were other courses pushing as well, as PCM, PP2 and Thesis Project but in the end everything was done. For the MOJO we planned every single detail as well with our poster, the pitcure of 42 and The Man, the deliverables and even two confortable chairs for the players to feel more confortable while playing (we had the best 2 chairs of MOJO). For me was a bit stressing as well because I had to divide my atention between The Fortress and Confront, my side project that is a boardgame that I pantented by myself. I can say it was a success as well because were always people interested in playing the game. About The Fortress was a success as well, we had a lot of amazing reviews, we expect to present ever single detail in our last report. Well thanks a lot to all of you that was present in MOJO. By: Miguel.